Production templates · Forms

Day out of days

A character × shooting-day grid with SW, W, WF, SWF, H and T codes that counts work, hold and total days per character.

A day out of days (DOOD) shows which shooting days each character works on one grid. Write dates across the first row, then mark each day with SW (start work), W (work), WF (work finish), SWF (one day only), H (hold) or T (travel). Excel counts work, hold and total days for each character; the sheet has 20 day columns.

The Excel file includes Example and Guide sheets next to the blank form. How to fill it in

What's inside

What's inside

  • Production
  • Shooting period
  • Version / date
  • Prepared by

Cast by shooting day

  • Character
  • Cast
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • Work days
  • Hold days
  • Total days

How to fill it in

What it is for

A day out of days (DOOD) shows, for each character, which shooting days are start, work, hold and finish, on one grid. It sizes cast engagements and fees and anchors scheduling talks with agents.

When to use it

Build it once the first stripboard schedule exists, and reissue it with a new version and date whenever the schedule changes. Send only the latest version to cast and production.

Field by field

  • Version / date

    What
    Which issue of the sheet this is
    How
    Bump the version every time the schedule changes and put it in the file name too.
    Example
    v2 · 2026-11-05
  • 1

    What
    What the character does on day 1
    How
    SW start work, W work, WF work finish, SWF one day only, H hold, T travel; leave blank if not called. Days 2–20 work the same way.
    Example
    SW
  • Work days

    What
    Days actually shooting
    How
    Excel counts codes containing W (SW, W, WF, SWF).
    Example
    4
  • Hold days

    What
    Days held without shooting
    How
    Mark gaps between first and last work as H and Excel counts them. Fewer holds save cast time and cost.
    Example
    2

Tips

  • Where a character’s first and last days are far apart, check the stripboard for ways to cut holds.
  • Gather one-day (SWF) characters scattered across days into a single day where possible.
  • Shade changed cells when you reissue so agents see what moved.

Common mistakes

  • Gaps between first and last work are left blank, so real holds are not counted.
  • The schedule changes but the old DOOD keeps circulating.
  • No dates across the top, so day numbers alone do not say when.

Filled-in example

Filled in for the fictional drama “The Temperature Between Us”. All people, companies and numbers are made up; the Excel file has the same example on its Example sheet.

Day Out of Days

ProductionThe Temperature Between Us
Shooting period2026-11-11 ~ 2026-11-21 (days 1–10)
Version / datev2 · 2026-11-05
Prepared bySeoyun Lee (AD dept.)

Cast by shooting day

CharacterCast1234567891011121314151617181920Work daysHold daysTotal days
Date11/1111/1211/1311/1411/1511/1711/1811/1911/2011/21
JaehoonHangyeol OhSWWWHWWF516
MinjunDoyun ParkSWWHHWWF426
Open the example full size · print

FAQ

When do I mark a hold (H)?

On days between first and last work with no shooting; the actor is still held, so the engagement shows as continuous.

When should the DOOD be reissued?

Whenever the schedule changes. Bump the version and date and send only the latest issue to cast and production.

Comments

Comments are visible to everyone, including visitors who are not signed in. Please do not post personal information such as contact details.

    Skip the forms. Start from the script.

    Upload a script and scenes, sets, cast and props are organized for you. Breakdowns, schedules and call sheets all come from the same data, and every change reaches the whole team as the latest version.

    Start for free